The public ticket board

Every central government infrastructure project (₹150 crore and above) as an open ticket — how long it has run, how late it is, what it costs now. Each ticket is automatically truth-checked by AI against live public reporting.

First time here? Beacon turns government project records into open tickets — delays, costs and AI truth-checks, all sourced. How this works →
Loading map…

Projects in Arunachal Pradesh

22 open · 13 late · ₹91,922 crore. MP report cards in Arunachal Pradesh.

  1. Subansiri Lower HE Project [2000 MW] — 188 months late
  2. Comprehensive Scheme for Strengthening of Transmission and Distribution [T&D] Systems [CSST&DS] in Arunachal Pradesh and Sikkim — 99 months late
  3. Roing-Hunli Road Greenfield Alignment Project — 51 months late
  4. Construction of Balance work of 2-Lane with PS of Joram Koloriang Road from existing Km122.600 to km138.00 [Design Km108.724 to Km123.714] in Arunachal Pradesh on EPC Mode under SARDP-NE Pkg-7 — 48 months late
  5. Provision of 4G Mobile Services in Uncovered Villages of Arunachal Pradesh and 2 Districts of Assam — 35 months late
  6. Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 163.59 to Km 206.66 Package-5 on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE [Job No SARDP-NE/P P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/116] — 30 months late
  7. North East Gas Grid — 28 months late
  8. Murkongselek-Pasighat — 21 months late
  9. 4-Laning of Itanagar to Bandardewa section of NH-415from km 40430 to km 51735 Package-Bon EPC Mode in the state of Arunachal Pradesh Job NO. 415/Ar. P/2020- 21/031 — 19 months late
  10. Construction of Balance work of 2-Lane with PS of Joram-Koloriang Road NH-713 on EPC basis from Design Km 44.989 to Km 61.547 Existing Km 50.050 to Km 70.000 in the state of Arunachal Pradesh under SARDP-NE Pkg-3 — 15 months late
  11. Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang from Design Km 0.000 to Km 53.000 Design Length 53.000 km, Greenfield Section of Frontier Highway NH-913 in the State of Arunachal Pradesh on EPC Mode Package-I — 1 months late
  12. Construction of Intermediate Lane Road with hard shoulder from design Km 0.000 to Km 17.387 Total length 17.387 km of Hunli to Ithun Bridge section on NH-913 Frontier Highway in State of Arunachal Pradesh on EPC mode under NHO-NE — -5 months late
  13. Widening/Improvement to 4-Lane with Paved Shoulder from km 55000 Nagabang Gamsuk to km 82514 Oyan in the State of Assam and Arunachal Pradesh on EPC mode under Bharatmala Pariyojna of Length 27.514 Km Package-3 — -10 months late
  14. Construction of Intermediate Lane of Pango to Jorging Road from 0000 to Design Km Design Km 40000 Design Length 40.00 Km, Pkg-l, Greenfield Alignment in the State of Arunachal Pradesh on EPC mode Pkg-1 — -11 months late
  15. Construction of lntermediate Lane Road with hard shoulder from design chainage Km 0.000 to Km 53.040 Existing Length68.500 Km & Total Design length 53.04 km of Tato to Monigong section of NH-913 Frontier Highway on Nafra Bomdila to Vijaynagar along China border in state of Arunachal pradesh on EPC mode — -15 months late
  16. Construction of 2-Laning with hard shoulders of Demwe-Brahmakund section of NH 13 from Ch.0.00 km to 18.464 km on EPC under SARDP-NE NHO-NE -Balance Work — -16 months late
  17. North Eastern Region Expansion Scheme-XXIII [NERES-XXIII] — -18 months late
  18. Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang Package III from design Km 60.000 to Km 121.500 Design Length 61.500 km, Greenfield Section of Frontier Highway NH-913 in the State of Arunachal Pradesh on EPC Mode Pkg-3 — -23 months late
  19. Construction of Permanent Campus of National Institute of Technology Arunachal Pradesh — -24 months late
  20. 240MW Heo HE Project — -35 months late
  21. 186 MW Tato-I H E Project — -35 months late
  22. Dibang Multipurpose Project — -66 months late