Construction of Balance work of 2-Lane with PS of Joram Koloriang Road from existing Km122.600 to km138.00 [Design Km108.724 to Km123.714] in Arunachal Pradesh on EPC Mode under SARDP-NE Pkg-7
Open ticket for a project in Arunachal Pradesh. Tracked on Beacon with AI news checks — vote anonymously.
- Running 48 months late
- Cost: ₹184 crore
- Agency: NHIDCL
- Status: ongoing
MPs in Arunachal Pradesh · More in Arunachal Pradesh · Check your PIN