Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang from Design Km 0.000 to Km 53.000 Design Length 53.000 km, Greenfield Section of Frontier Highway NH-913 in the State of Arunachal Pradesh on EPC Mode Package-I
Open ticket for a project in Arunachal Pradesh. Tracked on Beacon with AI news checks — vote anonymously.
- Running 1 months late
- Cost: ₹1262 crore
- Agency: NHIDCL
- Status: ongoing
MPs in Arunachal Pradesh · More in Arunachal Pradesh · Check your PIN