Construction of Balance work of 2-Lane with PS of Joram-Koloriang Road NH-713 on EPC basis from Design Km 44.989 to Km 61.547 Existing Km 50.050 to Km 70.000 in the state of Arunachal Pradesh under SARDP-NE Pkg-3
Open ticket for a project in Arunachal Pradesh. Tracked on Beacon with AI news checks — vote anonymously.
- Running 15 months late
- Cost: ₹228 crore
- Agency: NHIDCL
- Status: ongoing
MPs in Arunachal Pradesh · More in Arunachal Pradesh · Check your PIN