Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang Package III from design Km 60.000 to Km 121.500 Design Length 61.500 km, Greenfield Section of Frontier Highway NH-913 in the State of Arunachal Pradesh on EPC Mode Pkg-3
Open ticket for a project in Arunachal Pradesh. Tracked on Beacon with AI news checks — vote anonymously.
- Running -23 months late
- Cost: ₹1418 crore
- Agency: NHIDCL
- Status: ongoing
MPs in Arunachal Pradesh · More in Arunachal Pradesh · Check your PIN