Construction work of 4-laning of Shahganj bypass end to Badi Package-IV of NH-146B from design km 102.000 to design km 142.357 Design length 40.357 km
Open ticket for a project in Madhya Pradesh. Tracked on Beacon with AI news checks — vote anonymously.
- Running -7 months late
- Cost up 7%
- Cost: ₹836 crore
- Agency: National Highways Authority of India [NHAI]
- Status: ongoing
MPs in Madhya Pradesh · More in Madhya Pradesh · Check your PIN