4L Elevated Corridor and at-grade improvements from Design Ch0000 to Design Ch 19870 of Danapur Bihta Section, Design Ch0000 to Design Ch0231 connecting the existing RoB near Danapur station ,1.35 Km ramps and at-grade improvements to 4- lane section on Danapur side and Upgradation of existing Two lane carriageway to Four Lane carriageway from Design Ch19870 to Design Ch23500 of Bihta - Koilwar section
Open ticket for a project in Bihar. Tracked on Beacon with AI news checks — vote anonymously.
- Running 11 months late
- Cost: ₹2625 crore
- Agency: National Highways Authority of India [NHAI]
- Status: ongoing
MPs in Bihar · More in Bihar · Check your PIN