Widening / Improvement to 4-Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri - Phulbari Bridge approach Package-II of Srirampur - Dhubri Section of NH-127B from existing Km 28.050 to Km 55.060 Design Km 27.650 to Km 54.154, Design Length26.504 Km under JICA ODA Loan assistance Phase-V [Srirampur - Dhubri Pkg-2]
Open ticket for a project in Assam. Tracked on Beacon with AI news checks — vote anonymously.
- Running 5 months late
- Cost: ₹909 crore
- Agency: NHIDCL
- Status: ongoing
MPs in Assam · More in Assam · Check your PIN