Every central government infrastructure project (₹150 crore and above) as an open ticket — how long it has run, how late it is, what it costs now. Each ticket is automatically truth-checked by AI against live public reporting.

First time here? Beacon turns government project records into open tickets — delays, costs and AI truth-checks, all sourced. How this works →
Loading map…

Projects in Assam

88 open · 60 late · ₹156,432 crore. MP report cards in Assam.

  1. Subansiri Lower HE Project [2000 MW] — 188 months late
  2. NORTH EASTERN REGION POWER SYSTEM IMPROVEMENT PROJECT [NERPSIP] — 99 months late
  3. Development of Surface Facilities for production and evacuation of Crude Oil and Natural Gas from Nadua and East Khagorija — 76 months late
  4. 4-Laning of Jamugurihat to end of Biswanath Chariali By-Pass from Km 182.000 to Km 208.000 of NH-52 on EPC mode in state of Assam under SARDP-NE — 73 months late
  5. 4-Laning from Rangagara to Kaliabor Tiniali from km 297.00 to km 315.315 of NH-37 on EPC basis under SARDP-NE in state of Assam — 73 months late
  6. Dimapur [Dhansiri]-Sukhobi Kohima [Zubza] NL [82.5 Km] — 57 months late
  7. 2L with ES of Yagyi - Kalewa section from Milepost 40/0 to Milepost 115/5 in Myanmar — 49 months late
  8. Guwahati-Dibrugarh via Tinsukia & Simaluguri-Dibrugarh — 45 months late
  9. Borolia Irrigation Project — 39 months late
  10. Construction and up gradation to 4-Lane of existing two lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing Km 0.00 to km 14.050 and Design Km 0.000 to km 14.660 under BMP on EPC mode — 39 months late
  11. Provision of 4G Mobile Services in Uncovered Villages of Arunachal Pradesh and 2 Districts of Assam — 35 months late
  12. Construction of 4/6 Laning from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.050 to design Km 132.375] Total New Alignment length of 14.325 Km of Daboka -Dimapur Section Dimapur Bypass in the state of Assam under SARDP-NE 'Phase-A' on EPC mode Assam Portion — 34 months late
  13. Numaligarh Refinery Expansion Project — 32 months late
  14. Guwahati Refinery Expansion [1.0 to 1.2 MMTPA] along with installation of CRU, Guwahati Refinery — 31 months late
  15. Development of External Trunk Connectivity and Internal Infrastructure Works at Multi Model Logistics ParkMMLP at Jogighopa in the State of Assam on EPC Mode Package-I Road and Utility Works — 29 months late
  16. North East Gas Grid — 28 months late
  17. Paradip-Numaligarh Crude Oil Pipeline [PNCPL] & Crude Oil Import Terminal [COIT] at Paradip — 27 months late
  18. Construction of Field Gas Gathering Station at Baghjan area for collection, processing & transportation of natural Gas to be produced from Baghjan Field — 27 months late
  19. Earthwork in Formation, Road Work, Construction of Bridges, Blanketing, P. Way Linking works including Supply of P. Way Fittings and Track Ballast in connection with Construction of Railway Siding from Jogighopa Railway Station to MMLP at Jogighopa from Ch. 00 to 3760 on Item Rate basis Package -3, Railway Siding from Jogighopa Railway Station to MMLP — 27 months late
  20. DCU Revamp Project — 27 months late
  21. Mariani-Jorhat, Tinsukia-Dangri and Makum -TirapTrack Electrification Project — 27 months late
  22. Harmuty-Murkongselek Branch Line Electrification Project — 27 months late
  23. 6L Standalone Flyovers at Raha, Demow, Borghat, Kathiatali junctions and ROB at Jagiroad on stretches of NH 36 and NH 27 — 26 months late
  24. Tezpur University Projects — 25 months late
  25. Construction of New 2-Lane Bridge with its approaches from km 0000 to Km 4385 across River Brahmaputra on NH-17 at Jogighopa in Assam on EPC mode — 25 months late