Widening/lmprovement of Existing 2 lane to 4-Laning of Karimganj-Silchar section of NH-37 from Design Ch 0.000 near Silchar ISBT to Design Ch 15.970 near Kalinagar Pt I on NH-37 in Assam on HAM Mode Pkg-1
Open ticket for a project in Assam. Tracked on Beacon with AI news checks — vote anonymously.
- Running -13 months late
- Cost: ₹1181 crore
- Agency: NHIDCL
- Status: ongoing
MPs in Assam · More in Assam · Check your PIN