Construction of 4-Lane Panchgram Bypass from Design Chainage km 15500 on NH 37 Old NH-53 at Kalinagar Pt.-I Village to Design Chainage km 27300 at crossing with NH-6 Old NH-44 Near Siddeswar Pt.-I Village on Silchar - Churaibari stretch in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors Silchar- Churaibari Package-2
Open ticket for a project in Assam. Tracked on Beacon with AI news checks — vote anonymously.
- Running -6 months late
- Cost up 8%
- Cost: ₹728 crore
- Agency: NHIDCL
- Status: ongoing
MPs in Assam · More in Assam · Check your PIN