Construction of 2-Lane with paved shoulder of Kohima-Bypass Road connecting New NH-02 and New NH-29 from Design Km 10.500 to design Km 21.000 [Design Length 10.500 km] including TUNNEL of 500m at Ch. 11.000 in the state of Nagaland Under SARDP-NE on EPC Mode Package-2
Open ticket for a project in Nagaland. Tracked on Beacon with AI news checks — vote anonymously.
- Running 44 months late
- Cost: ₹277 crore
- Agency: NHIDCL
- Status: ongoing
MPs in Nagaland · More in Nagaland · Check your PIN