Construction of 2-lane with Paved shoulder of Kohima-Bypass Road connecting NH 39 New NH-02, NH150New NH-02, NH7-61 New NH-29 and NH-39 New NH-02 from Design km 21.000 to km 32.268 [Design length11.268 km] in the state of Nagaland Under SARDP-NE on EPC Mode Package- 3
Open ticket for a project in Nagaland. Tracked on Beacon with AI news checks — vote anonymously.
- Running 18 months late
- Cost up 114%
- Cost: ₹342 crore
- Agency: NHIDCL
- Status: ongoing
MPs in Nagaland · More in Nagaland · Check your PIN