Construction of 2-lane with Paved shoulder of Kohima- Bypass Road Connecting NH 39New NH-02, NH-150New NH-02, NH-61New NH-29, NH-39New NH-02 from Design Km 32.00 to Design Km 43.454Design Length-11.454 Km in the State of Nagaland under SARDP-NE on EPC Mode Package-IV
Open ticket for a project in Nagaland. Tracked on Beacon with AI news checks — vote anonymously.
- Running 56 months late
- Cost: ₹202 crore
- Agency: NHIDCL
- Status: ongoing
MPs in Nagaland · More in Nagaland · Check your PIN