Rehabilitation and upgradation to 2 lane with paved shoulder from existing chainage Km 166.100 to Km 192.98 design chainage Km 146.700 to Km 162.800 including construction of Bhimber Gali Tunnel Total Length of Tunnel 1.100 Km under 31 BRTF on Akhnoor-Poonch Roads on EPC mode NH-144A Package-VII
Open ticket for a project in Jammu and Kashmir. Tracked on Beacon with AI news checks — vote anonymously.
- Running 1 months late
- Cost: ₹734 crore
- Agency: MoRTH
- Status: ongoing
MPs in Jammu and Kashmir · More in Jammu and Kashmir · Check your PIN