Construction of Two lane with paved shoulder configuration of Shujalpur Bypass section of NH-752C from km 33100 Design to km. 42570 Design total design length 10.470 km in the State of Madhya Pradesh on EPC mode.
Open ticket for a project in Madhya Pradesh. Tracked on Beacon with AI news checks — vote anonymously.
- Running 8 months late
- Cost: ₹214 crore
- Agency: MoRTH
- Status: ongoing
MPs in Madhya Pradesh · More in Madhya Pradesh · Check your PIN