Construction of Two Lane with paved shoulder highway from Design Ch.0.000 to Ch.49.2OO of NH-731B on EPC Mode
Open ticket for a project in Uttar Pradesh. Tracked on Beacon with AI news checks — vote anonymously.
- Running 8 months late
- Cost: ₹602 crore
- Agency: MoRTH
- Status: ongoing
MPs in Uttar Pradesh · More in Uttar Pradesh · Check your PIN