Widening to four lane with paved shoulder from Design Km.49.200 to Km.89.285 of NH-731B on EPC mode in the state of Uttar Pradesh
Open ticket for a project in Uttar Pradesh. Tracked on Beacon with AI news checks — vote anonymously.
- Running 12 months late
- Cost up 5%
- Cost: ₹965 crore
- Agency: MoRTH
- Status: ongoing
MPs in Uttar Pradesh · More in Uttar Pradesh · Check your PIN