Construction of Ater realignment & Bhind bypass Total length. 21.50 km Section of NH-552Extn. to Two lane with paved shoulder configuration in the State of Madhya Pradesh on EPC mode.
Open ticket for a project in Madhya Pradesh. Tracked on Beacon with AI news checks — vote anonymously.
- Running 2 months late
- Cost: ₹348 crore
- Agency: MoRTH
- Status: ongoing
MPs in Madhya Pradesh · More in Madhya Pradesh · Check your PIN