Construction of Morena bypass, Ambah bypass & Porsa bypass Totat length 27.16 km Section of NH-552 Ext. to TWo lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode
Open ticket for a project in Madhya Pradesh. Tracked on Beacon with AI news checks — vote anonymously.
- Running -2 months late
- Cost: ₹492 crore
- Agency: MoRTH
- Status: ongoing
MPs in Madhya Pradesh · More in Madhya Pradesh · Check your PIN