Improvement and upgradation to two lane with Paved Shoulder configuration from existing km 55.00 to km 90.00 Design length 34.76 of NH-227A near Chhapia Village to near Sikriganj in the State of UP on EPC Mode.
Open ticket for a project in Uttar Pradesh. Tracked on Beacon with AI news checks — vote anonymously.
- Running 14 months late
- Cost: ₹307 crore
- Agency: MoRTH
- Status: ongoing
MPs in Uttar Pradesh · More in Uttar Pradesh · Check your PIN