Construction of Mariahu Bypass with four lane paved shoulder configuration Km. 53.540 to Km.59.200 of NH-135A on EPC mode in the state of Uttar Pradesh
Open ticket for a project in Uttar Pradesh. Tracked on Beacon with AI news checks — vote anonymously.
- Running 4 months late
- Cost: ₹362 crore
- Agency: MoRTH
- Status: ongoing
MPs in Uttar Pradesh · More in Uttar Pradesh · Check your PIN