Upgradation and reconstruction of existing intermediate lane to two Lane with paved shoulder configuration from km. 43.00 Barna River to km. 77.00 ken river length 34.00 km. on Gulganj-Amanganj-Pawai-Katni NH43 Extn. along with One time improvement in 01 no. of bypassed built-up area in a total length of 1.585 km in the state of Madhya Pradesh on EPCmode.
Open ticket for a project in Madhya Pradesh. Tracked on Beacon with AI news checks — vote anonymously.
- Running -3 months late
- Cost: ₹315 crore
- Agency: MoRTH
- Status: ongoing
MPs in Madhya Pradesh · More in Madhya Pradesh · Check your PIN