Construction of Bhabhua Bypass from Ch. 10800Design Ch. 10800 to Ch. 19860 Design Ch. 18150 and Chand Bypass from Ch. 38060 Design Ch. 36250 to Ch. 40460 Design Ch. 38650 and widening of existing road to 2 - lane with Paved shoulder from Ch. 40460 Design Ch. 38650 to Ch. 46860 Design Ch. 45050 of NH-219 Total length 16.150 Kmunder EPC mode in the state of Bihar
Open ticket for a project in Bihar. Tracked on Beacon with AI news checks — vote anonymously.
- Running 9 months late
- Cost: ₹179 crore
- Agency: MoRTH
- Status: ongoing
MPs in Bihar · More in Bihar · Check your PIN