Construction of new 4 lane major bridge with approaches on Sabarmati River near Dharoi at Km. 82/00 to 86/00 Design length 3.300 km on NH-58 in the State of Gujarat on Hybrid Annuity Mode HAM
Open ticket for a project in Gujarat. Tracked on Beacon with AI news checks — vote anonymously.
- Running -12 months late
- Cost: ₹398 crore
- Agency: MoRTH
- Status: ongoing
MPs in Gujarat · More in Gujarat · Check your PIN