Upgradation of Dindori-Sagartola-kabichabutra MP-CG border section of NH -45 from km 000Design to km 77.00 Design to Two lane with paved shoulder configration along with one time improvement in 04 nos. of bypaased built-up areas in a total length of 9.1 km in the state of Madhya Pradesh on EPC mode.
Open ticket for a project in Madhya Pradesh. Tracked on Beacon with AI news checks — vote anonymously.
- Running 6 months late
- Cost: ₹319 crore
- Agency: MoRTH
- Status: ongoing
MPs in Madhya Pradesh · More in Madhya Pradesh · Check your PIN