Construction of Champawat Bypass with two lane with paved shoulder configuration starting from existing chainage 121.700 to existing chainage 129.450 Design Length 9.847 of NH-125 in District-Champawat in the state of Uttrakhand on EPC mode.
Open ticket for a project in Uttarakhand. Tracked on Beacon with AI news checks — vote anonymously.
- Running -16 months late
- Cost: ₹220 crore
- Agency: MoRTH
- Status: ongoing
MPs in Uttarakhand · More in Uttarakhand · Check your PIN