Every central government infrastructure project (₹150 crore and above) as an open ticket — how long it has run, how late it is, what it costs now. Each ticket is automatically truth-checked by AI against live public reporting.

First time here? Beacon turns government project records into open tickets — delays, costs and AI truth-checks, all sourced. How this works →
Loading map…

Projects in Kerala

32 open · 25 late · ₹83,910 crore. MP report cards in Kerala.

  1. Kochi - Koottanad - Bangalore - Mangalore Pipeline Phase-II — 165 months late
  2. Widening to 2 Lanes with paved shoulders from Km.87/000 to 133/720 Nattukal to Thanau Jn. in Palakkad of NH-966 Old NH-213 on EPC mode Basis under NHO Annual Plan 2016-17 in the state of Kerala — 80 months late
  3. Thalassery Mahe Bypass Km 170.600 to Km 189.200 of NH-17New NH-66 in Kerala — 71 months late
  4. CONSTRUCTION OF PERMANENT CAMPUS FOR IIT PALAKKAD UNDER PHASE 1A — 48 months late
  5. 6L Minor Bridge Paloli Palam at km. 203.160 & Major Bridge Morad at km. 204.895 and allied works — 46 months late
  6. 6L of Taliparamba to Muzhappilangad from Km 134.650 to Km 170.6 of NH-66 — 43 months late
  7. Trivandrum- Kanyakumari — 39 months late
  8. Kozhikode Bypass Calicut Bypass Vengalam Jn. to Ramanattukara Jn. — 38 months late
  9. 6L of Perole Nileshwar town to Taliparamba from Km 94.248 to Km 134.650 of NH-66 — 38 months late
  10. 6L of Chengala - Neeleshwaram from km. 56.200 to km. 93.468 — 35 months late
  11. 6L of Azhiyur-Vengalam from km. 189.200 to km. 230.400 of NH-66 — 34 months late
  12. Six Laning of KT/KL Border Thalapaddy -Chengala from Km. 17.200 to Km. 57.20 — 23 months late
  13. Kadambattukonam-Kazhakuttom — 23 months late
  14. Kottankulangara- Start of Kollam Bypass — 22 months late
  15. 6L of Ramanatukkara Junction to start of Valanchery bypass section of NH-66 — 21 months late
  16. 6L of Valanchery bypass to Kappirikkad of NH 66 from km. 298500 to km 335850 — 21 months late
  17. Thuravoor Thekku-Paravoor — 20 months late
  18. 6L of Kodugallur to Edapppally section from km 397.750 to km 423.780 of NH - 66 old NH-17 — 20 months late
  19. Paravoor-Kottankulangara — 18 months late
  20. 6L of Kappirikkad to Thalikulam section from km 335.85 to km 369.015 of NH - 66 old NH-17 — 17 months late
  21. 6L of Thalikulam to Kodugallur section from km 369.015 to km 397.850 of NH - 66 old NH-17 — 16 months late
  22. Start of Kollam Bypass - Kadambattukonam — 15 months late
  23. Development of additional RESA on either end on Runway 10-28 at Calicut Airport. Construction of embankment with slope protection, drainage system and associated works for additional RESA on either end on Runway 10-28 — 15 months late
  24. Widening/Development of Existing NH-85 from Km 0.000 to Km 124.636 section to 2L/LPS section in the state of Kerala on EPC Mode under Bharatmala Pariyojana — 11 months late
  25. Aroor-Thuravoor Thekku — 5 months late