Construction of Dubrajpur Bypass with 4-lane configuration of length 5.676 km on NH 60 new NH-14 from design chainage 0.00 design chainage 5.676 existing km 320.980 on NH-60 West Bengal under Annual Plan 2022-23 in EPC Mode- reg. 23/518 .
Open ticket for a project in West Bengal. Tracked on Beacon with AI news checks — vote anonymously.
- Running -16 months late
- Cost: ₹560 crore
- Agency: MoRTH
- Status: ongoing
MPs in West Bengal · More in West Bengal · Check your PIN