Up-gradation to Four Lane with Paved Shoulder configuration of the highway starting from existing km 88.400 Savali Vihir to km 163.400 start of Ahmednagar bypass Design Length 75.000 km section of NH-160 in the State of Maharashtra under Bharatmala Pariyojana on EPC Mode
Open ticket for a project in Maharashtra. Tracked on Beacon with AI news checks — vote anonymously.
- Running -8 months late
- Cost: ₹617 crore
- Agency: NHAI
- Status: ongoing
MPs in Maharashtra · More in Maharashtra · Check your PIN