Realignment of NH-717A from Design Ch.0.00 Km 77.800 of NH-10 to Design Ch.2.00 Km 3.100 of NH-717A with two lane paved shoulder including Major Bridge of 680 m in the State of Sikkim on EPC Mode-COS work
Open ticket for a project in Sikkim. Tracked on Beacon with AI news checks — vote anonymously.
- Running 36 months late
- Cost up 44%
- Cost: ₹380 crore
- Agency: NHIDCL
- Status: ongoing
MPs in Sikkim · More in Sikkim · Check your PIN