Widening and Up-gradation to 2- Lane with Paved Shoulder Configuration and geometric improvement from Km. 166. 000 to Km 208.000 Package-4 on Aizawl Tuipang Section of NH-54 in the State of Mizoram Package-4
Open ticket for a project in Mizoram. Tracked on Beacon with AI news checks — vote anonymously.
- Running 24 months late
- Cost: ₹899 crore
- Agency: NHIDCL
- Status: ongoing
MPs in Mizoram · More in Mizoram · Check your PIN