Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 298.00 to km 339.00 on Aizawl-Tuipang section under JICA ODA Loan assistance Phase-I Package-7
Open ticket for a project in Mizoram. Tracked on Beacon with AI news checks — vote anonymously.
- Running 13 months late
- Cost up 24%
- Cost: ₹750 crore
- Agency: NHIDCL
- Status: ongoing
MPs in Mizoram · More in Mizoram · Check your PIN