Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 250.00 Lunglei to km 298.00 on Aizawl-Tuipang section under JICA ODA Loan assistance Phase-I Package-6
Open ticket for a project in Mizoram. Tracked on Beacon with AI news checks — vote anonymously.
- Running 23 months late
- Cost: ₹768 crore
- Agency: NHIDCL
- Status: ongoing
MPs in Mizoram · More in Mizoram · Check your PIN