Improvement and Widening to 2-lane with paved shoulder of road from existing Km 438.170 Khowai Chowmuhani to existing Km 439.410 South Pulinpur of NH-08 and from design Km 0.000 South Pulinpur to design Km 36.00 near Rangamati of NH 208 on Khowai Teliamura- Harina section Total length 37.24 in the state of Tripura on EPC mode under JICA ODA Loan Phase VI Package-2
Open ticket for a project in Tripura. Tracked on Beacon with AI news checks — vote anonymously.
- Running -1 months late
- Cost: ₹657 crore
- Agency: NHIDCL
- Status: ongoing
MPs in Tripura · More in Tripura · Check your PIN