Improvement and Widening to 2-lane with paved shoulder of road from design Km 36.000 Rangamati to design Km 72.000 Pati Chhari Total length 36.000 Km on Teliamura to Harina section of NH 208 in the state of Tripura on EPC mode under JICA ODA Loan Phase VI Package-3
Open ticket for a project in Tripura. Tracked on Beacon with AI news checks — vote anonymously.
- Running -1 months late
- Cost: ₹670 crore
- Agency: NHIDCL
- Status: ongoing
MPs in Tripura · More in Tripura · Check your PIN