Rehabilitation and upgradation to 2 Lane with Paved shoulder of Economic corridor of NH-6 from Design chaiange Km 0.000 to Km 13.510 Package-1 in the state of Mizoram under Bharatmala Pariyojana on EPC mode
Open ticket for a project in Mizoram. Tracked on Beacon with AI news checks — vote anonymously.
- Running 24 months late
- Cost: ₹206 crore
- Agency: NHIDCL
- Status: ongoing
MPs in Mizoram · More in Mizoram · Check your PIN