Rehabilitation / Upgradation to 4 Lane with Paved shoulder of Existing Section in Sillod Town with Design Ch. Km54500 to Km 60679 [Length6.179 km] section of NH 753F Aurangabad-Jalgaon road on EPC Mode in the State of Maharashtra
Open ticket for a project in Maharashtra. Tracked on Beacon with AI news checks — vote anonymously.
- Running -4 months late
- Cost: ₹153 crore
- Agency: MoRTH
- Status: ongoing
MPs in Maharashtra · More in Maharashtra · Check your PIN