Rehabilitation and Up-gradation of i. Deogaon phata to Digras phata Ch. 0/000 to 15/000 & Selu to Borgavhan Ch 20/900 to 35/800 [Length 29.9km] ii. Injegaon Dhamoni to Pohner Phata Ch.58/200 to Ch. 83/700 [Length25.5 km] and iii. Pohner phata to Pathri Design Ch. 42/700 to 58/200 [Length 15.5 km] sections of NH-548B to Two lane with paved shoulder configuartion in the state of Maharashtra on EPC mode Total project length 70.9 Km.
Open ticket for a project in Maharashtra. Tracked on Beacon with AI news checks — vote anonymously.
- Running -9 months late
- Cost: ₹761 crore
- Agency: MoRTH
- Status: ongoing
MPs in Maharashtra · More in Maharashtra · Check your PIN