Widening to two lane with paved shoulder of Rampachodavaram - Koyyuru section of NH 516E from Km 43700 to Km 113820 in the State of Andhra Pradesh on EPC mode Job No. 737
Open ticket for a project in Andhra Pradesh. Tracked on Beacon with AI news checks — vote anonymously.
- Running 15 months late
- Cost: ₹568 crore
- Agency: MoRTH
- Status: ongoing
MPs in Andhra Pradesh · More in Andhra Pradesh · Check your PIN