Widening, Reconstruction & Up-gradation to 2 lane with Paved Shoulder/Four Lane configuration for the work of Sautada to Shirapur Section of NH-561 from Design km 86300 to km 125589 in the state of Maharashtra on EPC mode. Design length 39.289 km
Open ticket for a project in Maharashtra. Tracked on Beacon with AI news checks — vote anonymously.
- Running -3 months late
- Cost: ₹349 crore
- Agency: MoRTH
- Status: ongoing
MPs in Maharashtra · More in Maharashtra · Check your PIN