Up-gradation to 2 lane with Paved shoulder from Charbhuja at Design km 0.00 existing km 150.00 to Neechli Oden Nathdwara at Design ch. Km 88.800 existing km 55.950 of NH-162E on EPC mode.
Open ticket for a project in Rajasthan. Tracked on Beacon with AI news checks — vote anonymously.
- Running 11 months late
- Cost: ₹838 crore
- Agency: MoRTH
- Status: ongoing
MPs in Rajasthan · More in Rajasthan · Check your PIN