Rehabilitation/Upgradation of existing Highway to 2LPS/4 lane of Dhawali to Rajoli from Design Km.149476 to 163476 existing Km.150000 to 164000, Pandhasala to Mohadongri from design Km.170476 to 181476 existing Km.171000 to 182000, Ambeshivni Fata to Bodli from design Km.183476 to 185476 existing Km.184000 to 186000 and Made Tukum to Gadchiroli from design Km.188476 to 189476 existing Km.188000 to 18900 having length 28 km of NH-930 of Dhawali to Gadchroli road in the
Open ticket for a project in Maharashtra. Tracked on Beacon with AI news checks — vote anonymously.
- Running 11 months late
- Cost: ₹316 crore
- Agency: MoRTH
- Status: ongoing
MPs in Maharashtra · More in Maharashtra · Check your PIN