Up-gradation to two lane with paved shoulder configuration of NH-354 Section Arifkes Ferozepur-Muktsar-Malaut from Km 201.500 to Km 212.500 & Km 229.690 to Km 269.960 and strengthening of existing pavement from Km 212.500 to Km 229.690 excluding Km 218.500 to 223.690 of NH-354 on EPC Mode in the State of Punjab. Job No. NH-354-PB-2020-21-532
Open ticket for a project in Punjab. Tracked on Beacon with AI news checks — vote anonymously.
- Running 12 months late
- Cost: ₹263 crore
- Agency: MoRTH
- Status: ongoing
MPs in Punjab · More in Punjab · Check your PIN