Widening of basic strip at Western Side of Runway Chainage 80m to 920m i/c slope stabilization Measures [Balance work] of uphill and Improvement of Storm Water Drainage System at Pakyong Airport, Sikkim on design & build basis [EPC] with integrated 10 years maintenance.
Open ticket for a project in Sikkim. Tracked on Beacon with AI news checks — vote anonymously.
- Running 2 months late
- Cost: ₹323 crore
- Agency: Airport Authority of India [AAI]
- Status: ongoing
MPs in Sikkim · More in Sikkim · Check your PIN