Rangit-IV HE Project [120 MW] executed by Jal Power Corporation Ltd. [JPCL] - A wholly owned subsidiary of NHPC Ltd. acquired through NCLT
Open ticket for a project in Sikkim. Tracked on Beacon with AI news checks — vote anonymously.
- Running 19 months late
- Cost up 95%
- Cost: ₹1828 crore
- Agency: National Hydroelectric Power Corporation Limited [NHPC]
- Status: ongoing
MPs in Sikkim · More in Sikkim · Check your PIN